Application
CZPT farms
Flood management
Irrigation and drainage project
H2o ingestion project
Coal and mining industry
Benefit
No infrastructure needed for installation.
CZPT installation and start-up
Simple relocation of gear to different pumping zone
Ingestion h2o is of highest top quality possible thanks to floor suction
Large resistance materials with lower-value and simple servicing
Impervious to adverse running problems like robust currents, foreign supplies, and many others.
CZPT materials and design and style conceived for durability whilst continuously working in adverse environments (salt water, large presence of solids, etc).
CZPT Information
Max. Capability: 90000m3/h
Max. Head: 2200m
Energy provide: (380V, 660V, 1140V, 3000V, 10KV) ±5% 50Hz/60Hz